Description of the Project
Contract for the operation of storm tanks of the Manzanares river.
Included within the infrastructure plan for improving the waters of the River Manzanares.
With a capacity of over 400,000 m3 each tank, they make it possible to manage the excess of wastewater into treatment plants.